Close Menu
The Oasis Report | Latest Saudi Arabia News & Updates
  • Home
  • Analysis
  • Business
  • Economy
  • Finance
  • Investor
  • Opinion
  • Saudi Arabia
  • Startups
What's Hot

Muhammad Al Nisfan wins gold medal at German International Squash Championships – Saudi News

February 23, 2026

2026 gets off to a strong start with real estate transaction value rising to over $477 million

February 23, 2026

UK fund giant L&G puts $1 billion into new wave of natural debt exchanges

February 23, 2026
Facebook X (Twitter) Instagram
Trending
  • Muhammad Al Nisfan wins gold medal at German International Squash Championships – Saudi News
  • 2026 gets off to a strong start with real estate transaction value rising to over $477 million
  • UK fund giant L&G puts $1 billion into new wave of natural debt exchanges
  • Benzema’s first reaction to the wave of criticism – Saudi News
  • Saudi Aramco sells first Jafra condensate cargo to US company and India, officials say
  • Egypt’s banking sector’s net external assets to surge by $20.3 billion in 2025, central bank says
  • Our Kingdom was founded on justice and unity under one flag
  • Minister of Interior: Security forces…shield and support for the country in the face of challenges – Saudi News
  • Home
  • About Us
  • Advertise With Us
  • Contact US
  • DMCA
  • Privacy Policy
  • Terms and Conditions
Facebook X (Twitter) Instagram
The Oasis Report | Latest Saudi Arabia News & UpdatesThe Oasis Report | Latest Saudi Arabia News & Updates
Monday, February 23
  • Home
  • Analysis
  • Business
  • Economy
  • Finance
  • Investor
  • Opinion
  • Saudi Arabia
  • Startups
The Oasis Report | Latest Saudi Arabia News & Updates
Home » Egypt-Saudi power interconnection enters final testing phase, expected to open within weeks

Egypt-Saudi power interconnection enters final testing phase, expected to open within weeks

adminBy adminFebruary 23, 2026 Finance No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email


Egyptian Minister of Electricity and Renewable Energy Mahmoud Esmat announced that the Egypt-Saudi Electricity Interconnection Project has entered the final testing phase and is coordinating closely with the Saudi side to complete the pilot and start grid connection in the coming weeks.

The announcement was made during a site visit to a 500 kV high voltage direct current (HVDC) substation in Badr city. The facility is considered the first of its kind in the Middle East in terms of size, manufacturing technology and operational capabilities for cross-border power transmission.

Accompanied by senior officials from the Egyptian Electricity Transmission Company, Mr. Esmat toured the control and operations center and reviewed the progress of equipment testing and overall system readiness before synchronizing the project with the integrated grid of both Egypt and Saudi Arabia.

The Minister assessed the status of operational trials of the Badr substation and Sakakin Taba 2 power plant, as well as the approximately 320 km long 500kV overhead transmission line connecting Badr and Taba 2. We also reviewed work related to submarine and underground cables, AC/DC supply systems, medium and low voltage connections, control panels, optical fiber networks (OPGW), and related infrastructure.

Esmat described the electricity interconnection project as an “energy bridge” that will strengthen strategic cooperation and promote economic integration. He stressed that the Egyptian-Saudi collaboration is an important step towards establishing a fully integrated regional power grid and, ultimately, a common Arab electricity market.

The project is expected to strengthen grid stability, improve service quality, increase reliance on renewable energy sources, and reduce fuel consumption through more efficient power generation and load management. It also takes advantage of differences in peak demand periods between the two countries, enabling more efficient use of generation capacity and more cost-effective grid operations.

The project, with a total switching capacity of 3,000 MW, will connect three major high-voltage converter stations – two in the eastern and northwestern parts of Saudi Arabia and one in the city of Badr, east of Cairo – via approximately 1,350 kilometers of overhead transmission lines and submarine cables across the Red Sea. This is widely seen as a strategic milestone towards connecting the power grids of Africa, Asia and Europe.

© 2026 Daily News Egypt. Provided by SyndiGate Media Inc. (Syndigate.info).



Source link

admin
  • Website

Keep Reading

2026 gets off to a strong start with real estate transaction value rising to over $477 million

Egypt’s banking sector’s net external assets to surge by $20.3 billion in 2025, central bank says

Jazeera Airways introduces ‘fly now, pay later’ option

Crude oil heads for first weekly gain in three weeks as tensions between US and Iran rise

Total lease agreement in Ajman in 2025 is $1.8 billion

RTA announces diverse community events during Ramadan

Add A Comment
Leave A Reply Cancel Reply

Editors Picks

2026 gets off to a strong start with real estate transaction value rising to over $477 million

February 23, 2026

Egypt’s banking sector’s net external assets to surge by $20.3 billion in 2025, central bank says

February 23, 2026

Jazeera Airways introduces ‘fly now, pay later’ option

February 23, 2026

Egypt-Saudi power interconnection enters final testing phase, expected to open within weeks

February 23, 2026
Latest Posts

Subscribe to News

Subscribe to our newsletter and never miss our latest news

The Oasis Report is an independent digital news platform dedicated to delivering timely, accurate, and insightful coverage of Saudi Arabia. Our mission is to keep readers informed about the Kingdom’s rapidly evolving political, economic, social, and cultural landscape.

Facebook X (Twitter) Instagram Pinterest YouTube

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact US
  • DMCA
  • Privacy Policy
  • Terms and Conditions
© 2025 theoasisreport. Designed by TeraSolutions.io

Type above and press Enter to search. Press Esc to cancel.